MHIC #117311 · Maryland Service Area
Bathroom Remodeling in Maryland — MHIC #117311
From Bethesda colonials to Annapolis waterfront homes, our team has been remodeling Maryland bathrooms since 2005. Every project — primary suite, hall bath, half bath, basement powder — gets the same in-house craftsmanship, fixed-price quote, and 5-year workmanship warranty.

Quick Answer: A full bathroom remodel in Maryland typically costs $15,000–$35,000 and completes in 4–6 weeks once permits are issued. Eagle Home Improvements is an MHIC-licensed design-build remodeler (MHIC #117311) handling demolition, plumbing, electrical, tile, and finish in-house. Free estimate: (240) 266-8317.
Pricing
Bathroom Remodeling cost in Maryland (2026)
| Scope | Investment range | Includes |
|---|---|---|
| Designer refresh | $8,500 – $18,000 | Premium vanity, designer fixtures, custom paint, statement lighting, mirror, hardware. Same footprint. |
| Half / powder bath | $15,000 – $22,000 | Full surface replacement, premium toilet and vanity, custom tile and lighting. |
| Standard full bath | $22,000 – $38,000 | New walk-in shower or freestanding tub, designer tile, vanity, fixtures, lighting, ventilation. |
| Primary suite remodel | $38,000 – $65,000 | Walk-in shower with bench, double vanity, freestanding tub, heated floor, custom storage. |
| Luxury / full gut | $65,000 – $125,000+ | Custom millwork, stone slabs, steam shower, smart fixtures, full layout reconfiguration. |
Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.
Process
How an Eagle Home Improvements bathroom remodeling project unfolds
- 01In-home consultationWalk-through, scope review, lifestyle questions, rough budget alignment. 60–90 minutes, free.
- 02Design & material selection3D renderings, tile samples, fixture brands, finish board. You see and touch every choice before signing.
- 03Fixed-price agreementNo hourly billing. Line-item itemization, payment schedule, change-order policy in writing.
- 04Permits & lead timesWe pull every county permit (Montgomery, Howard, Anne Arundel, Baltimore, Frederick, Prince George's) and order materials before demo.
- 05BuildDaily clean-up, single foreman, photo updates, plastic floor protection. Bathroom is unusable on average 14–18 days.
- 06Quality walk + warrantyPunch list, county final inspection, signed warranty (5-year workmanship + manufacturer fixture warranties).
Materials we use
Trusted brands across every bathroom remodeling project
- Kohler
- Moen
- Delta
- Toto
- Daltile
- MSI
- Quartz countertops
- Solid wood vanities
- Schluter waterproofing
- Dryer-vented exhaust fans
Permits & code
Maryland permits we handle
Bathroom remodels involving plumbing relocation, electrical updates, or structural changes require a permit in every Maryland jurisdiction we serve. We file permits in Montgomery, Howard, Anne Arundel, Baltimore County, Baltimore City, Prince George's, Frederick, Carroll, and Charles counties on your behalf — and coordinate every inspection.
Verify our credentials: MD MHIC License Lookup · MD Home Improvement Commission
Warranty
5-year workmanship
5-year workmanship warranty plus manufacturer warranties on every fixture, tile, and finish. Documented in writing at project close.
Sub-services for bathroom remodeling
Every bathroom remodeling sub-service we offer in Maryland
Eagle Home Improvements handles every variation of bathroom remodeling — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.
- Tub-to-walk-in shower conversionRemove old tub, build curbless walk-in shower with bench, glass enclosure, and waterproofing membrane.MD note: Most common request in MD aging-in-place renovations. Permit required statewide.
- Primary suite spa bathWalk-in shower + freestanding tub + double vanity + heated floor + custom storage tower.MD note: Bethesda, Potomac markets — $40K-$80K typical. Larger MD lots accommodate dual showerheads.
- Half / powder bath redesignNew vanity, toilet, tile, lighting, and statement wallpaper or paint in same footprint.MD note: Common ROI play in Annapolis Historic and Roland Park rowhomes — period-correct fixtures available.
- Aging-in-place bathroomCurbless shower, grab-bar reinforcement, comfort-height toilet, lever handles, anti-slip tile.MD note: Maryland Older Adults Tax Credit reimburses portion of accessibility upgrades. We document scope for credit eligibility.
- Basement bathroom addition (with sewage ejector)Adding full bath below sewer line — sewage ejector pump, tile, fixtures, lighting, ventilation.MD note: Common in MD finished-basement projects. Adds $14K–$22K to scope. Always permitted.
- Heated tile floor (radiant electric)Electric radiant heat under tile for spa-grade comfort. Add-on to any full bath remodel.MD note: Comfort upgrade for cold MD tile-floor mornings. Adds $1,500-$2,500 typical.
- Period-correct bathroom restoration (historic)Reproduction subway tile, period brass fixtures, plaster wall restoration, and matching trim profiles.MD note: Annapolis HPC, Roland Park, and Baltimore historic-district homes. We source historically accurate materials.
- Steam shower installationSealed shower enclosure with steam generator, vapor-tight glass, ceiling slope, and bench.MD note: Premium add — $8K-$15K incremental over standard shower. Popular in Bethesda primary baths.
Maintenance — keep it perfect
How to maintain your bathroom remodeling in Maryland
MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.
- Every 18-24 monthsRe-caulk shower perimeter every 18-24 monthsRemove old silicone, scrub mold, dry 24 hours, apply new mildew-resistant 100% silicone. Avoid acrylic.
- Every 5-7 yearsRe-grout grout lines every 5-7 yearsRemove top 2-3mm of grout with grout saw, vacuum clean, apply new grout color-matched to existing.
- Every showerRun exhaust fan 20 minutes after every showerHard-wired fan with 30-minute timer eliminates the "did I leave it on?" question. Critical for MD humidity.
- AnnualSeal natural stone counters annuallyApply penetrating sealer (Aquamix, Stone Care), let dwell 5 minutes, buff dry. Quartz does not need sealing.
- QuarterlyInspect shower drain and overflowRemove drain cover, clear hair and soap scum. Check overflow plate gasket for cracks.
- AnnualTighten faucet handles + spout connectionsFaucets loosen with use. Tighten setscrews or compression nuts seasonally to prevent micro-leaks.
FAQ
Frequently asked questions about bathroom remodeling in Maryland
How much does a bathroom remodel cost in Maryland in 2026?
Most full Maryland bathroom remodels cost $15,000–$35,000 in 2026. Cosmetic refreshes start around $5,000; primary-suite or luxury work runs $35,000–$80,000+. Final price depends on scope, fixture grade, and county labor rates.
How long will my bathroom be unusable?
Plan for 14–18 days of unusable bathroom time within a 4–6 week project. We sequence demolition, rough plumbing/electric, and tile back-to-back to minimize displacement.
Do I need a permit for a bathroom remodel?
Yes — any plumbing relocation, electrical update, or structural change requires a permit in every MD county we serve. Eagle Home Improvements pulls every permit on your behalf.
Can you match historic homes in Bethesda or Annapolis?
Yes. We regularly work in 1920s–1960s Maryland homes and source period-appropriate tile, fixtures, and millwork while modernizing electrical and waterproofing to current code.
Do you offer financing?
Yes — 0% promotional financing is available for qualified Maryland homeowners through our partner lenders. Discussed at your free estimate.
Do you handle demolition and debris removal?
Yes. Demolition, disposal, and clean-up are included in every fixed-price quote. You will not need a separate dumpster or disposal service.
What's your warranty?
5-year workmanship warranty plus full manufacturer warranties on fixtures, tile, and surfaces. Signed at project completion.
Can you start within 2 weeks?
Typical wait from signed contract to demo day is 4–6 weeks (design + permits + material lead time). Emergency repair work can start faster.
Other services
One MHIC-licensed team for every Maryland remodel
- Kitchen Remodeling →
- Home Additions →
- Basement Finishing →
- Whole-Home Renovation →
- Flooring Services →
- Painting Services →
- Drywall Repair & Installation →
Top service areas
Bathroom Remodeling across Maryland
- Bathroom Remodeling in Bethesda
- Bathroom Remodeling in Potomac
- Bathroom Remodeling in Chevy Chase
- Bathroom Remodeling in Silver Spring
- Bathroom Remodeling in Rockville
- Bathroom Remodeling in Annapolis
- Bathroom Remodeling in Columbia
- Bathroom Remodeling in Ellicott City
- Bathroom Remodeling in Baltimore
- Bathroom Remodeling in Towson
From the Field
Bathroom Remodeling — recent work by our crew



